Shoonya Campaign Townhall - Inviting Suggestions on how can EV charging infrastructure become more accessible and convenient for everyone in our cities and towns

Shoonya Campaign Townhall - Inviting Suggestions on how can EV charging infrastructure become more accessible and convenient for everyone in our cities and towns
Start Date :
Jan 16, 2024
Last Date :
Feb 16, 2024
23:45 PM IST (GMT +5.30 Hrs)
Submission Closed

The NITI Aayog-led Shoonya campaign, in partnership with MyGov India, is thrilled to announce the electric vehicles Townhall, an open discussion platform for citizens to share ...

The NITI Aayog-led Shoonya campaign, in partnership with MyGov India, is thrilled to announce the electric vehicles Townhall, an open discussion platform for citizens to share valuable ideas and suggestions to promote and enhance the clean electric mobility ecosystem in India. The Townhall focuses on electric vehicles (EVs) and their associated advantages, including cost savings, clean air, health benefits, and emission reduction.

In line with this initiative, NITI Aayog in collaboration with MyGov, invites input from citizens.

To learn more about the Shoonya Campaign and discover the benefits of EVs, please visit the Shoonya campaign website at www.shoonya.info

Reset
Showing 435 Submission(s)
ANINDA DAS
ANINDA DAS 2 years 6 months ago
AIR correspondent reports that Shoonya initiative promotes zero-pollution delivery vehicles by working with consumers and industry. The campaign aims to accelerate adoption of electric vehicles in the urban deliveries segment and create consumer awareness about the benefits of zero-pollution delivery. Urban freight vehicles account for 10 percent of freight transportation-related carbon dioxide emissions in India, and these emissions are expected to grow by 114 percent by 2030. EVs emit no tailpipe emissions, which can contribute immensely to improved air quality. They emit 15 to 40 percent less carbon dioxide compared to their internal combustion engine counterparts and have lower operational cost even during their manufacture.
VIVEK SHARMA
VIVEK SHARMA 2 years 6 months ago
इलेक्ट्रॉनिक वाहनों के चार्जिंग स्टेशन सभी बड़े शहरों एवं प्रत्येक छोटे गांव में लगाने अति आवश्यक हैं। इलेक्ट्रॉनिक वाहनों के चार्जिंग स्टेशनों के बारे में सभी आम नागरिकों को जागरूक करने की अति आवश्यकता है। इलेक्ट्रॉनिक वाहनों के चार्जिंग स्टेशन वर्तमान समय में जिस प्रकार पेट्रोल पंप इत्यादि हैं इसी प्रकार चार्जिंग स्टेशनों का भी निर्माण होना चाहिए इससे अधिक से अधिक इलेक्ट्रॉनिक वाहनों का उपयोग हो सकेगा एवं विभिन्न प्रकार की बचत भी होगी।
Rakesh gupta
Rakesh gupta 2 years 6 months ago
here are some list of electric charging station set up by companies in india about 30 companies are in the Market. Indigreen Electric vehicles charging station by IOCL. Jio bp pulse EVCS by Jio and Bharat petroleum. Okaya EVCS Switch EVCS Charge Point ATEEL (by Adani total gas & energy Ltd) EVCS Delta Electronics EVCS Tata Power EVCS Some Govt. Contract received companies also in the market. and many more pvt. limited firms is doing work in maintenance and operation work management.
Rakesh gupta
Rakesh gupta 2 years 6 months ago
India is facing problem to electricity supply not available for 24 hours many areas in the country. and we know for EVs charging there is need of continuously electricity supply without light cut off. so continuously charging by high Load charger of capacity 3kw, 7kw, 30kw, 60kw, 90kw, 150kw charger. these chargers draw the huge power load from the supply transmission lines, power stations and Grid. So please Govt of India take necessary actions to full supply 24 hours without cutoff electricity supply. because if once the light cut off during charging we don't know in India when it will come back supply again. So continuously power supply is very much neccessary also.
kamlesh Roy
kamlesh Roy 2 years 6 months ago
why recharge the vehicle? I think some different types of mechanism. which is automatically recharge the vehicle. or why not think about our indian railway for this type of mechanism. I think its possible and well for electric ⚡ vehicle. our engineers try one project of non recharge vehicle, automatically recharge by itself by running on road. and also think about green power for house 🏠 thank you kamlesh Roy
Rakesh gupta
Rakesh gupta 2 years 6 months ago
Solar panel based ongrid electric power generation should set up all over India. because Ev charging station need of very much power supply. A electric vehicles Car has a commercial charger of 30 KW Load for fast charging take 30 minutes to 75 minutes for full charge. At home EVs car charging take 16 hours from normal charger of 3 kw Load. At Home by 7 kw load , 3 faze connections and a fast charger take 6-7 hours for full charge. EVs two wheeler can charge by home normal charger in 8 hours. EV Bus take charging time 3- 5 hours by 30kw, 90 kw, 150 kw charging Load charger in fast charging.
Saivijay Pisini
Saivijay Pisini 2 years 6 months ago
India is transforming towards climate change. As of now EV infrastructure should be Developed and EV stations should be established for every 8kms and in cities it should be at every malls and bunks. In all educational institutions it should be established so that it promotes to students to go for EV
Rakesh gupta
Rakesh gupta 2 years 6 months ago
https://acrobat.adobe.com/id/urn:aaid:sc:AP:a9d84954-1878-493d-a149-37b677c4b295 For ADANI Electric charging station catalogue
Rakesh gupta
Rakesh gupta 2 years 6 months ago
Electric charging station near at coastal area of India and islands.... Synchronous motor principle for electric energy generation by oscillation in sea waves. As we know ocean are good source of continuously motion waves. If we are able to use this kind of motion mechanical energy can use to move turbines of generators and then direct joint to the Motor. " This way all generators and motor remaining in running position by help of torque produces by ocean waves energy." × Power factor increases × RO sea water purifier projects motor running by synchronous principle. × shunt load capacity of power supply with limited supply only. × Capacitor charge bank to battery charging point near the coastal area of India. Electric charging station. × Multi small propeller move by ocean oscillation and move to the turbines rod/ shaft of motor simultaneously. Thus Life on the sea / blue lagoon possible at all islands. And electricity available all over the island.